Skip to content
All posts

Case Study: Helping a Global Automotive Supplier Successfully Pass a Toyota New Supplier Audit and Secure New Business

Client: Large Global German Automotive Supplier
Facility: North American Manufacturing Plant (Mexico)
Customer: Toyota Motor Corporation
Industry: Automotive Electronics and Electromechanical Components


The Challenge

A large global automotive supplier was preparing for a Toyota New Supplier Evaluation, one of the most rigorous supplier qualification processes in the automotive industry.

Toyota audits evaluate far more than quality metrics. They assess how well a supplier’s manufacturing system aligns with Toyota Production System (TPS) principles, including:

    • Standardized work
    • Process discipline at the gemba
    • Traceability and containment systems
    • PFMEA alignment with production risks
    • Change management and process control
    • Special process capability

The upcoming audit would include both a full plant operational review and a special process evaluation of welding operations, a process that requires strict process control and statistical capability.

Although the facility already demonstrated strong performance metrics, plant leadership recognized that Toyota audits require tight alignment between documentation, floor practices, and operator understanding.

To ensure readiness, the supplier engaged  TKD²  to perform an independent operational assessment and prepare the organization for the Toyota audit.


 TKD²  Approach

 TKD²  conducted a multi-day operational readiness assessment of the manufacturing facility, evaluating the plant through the same lens used by Toyota Supplier Development engineers.

The review included:

    • Production floor walkthroughs
    • Documentation and procedure audits
    • Operator and leadership interviews
    • Review of PFMEA and Control Plan alignment
    • Evaluation of traceability systems
    • Special process review of welding operations
    • Assessment of Toyota Production System practices at the gemba

The objective was to identify any gaps between documented systems and what Toyota auditors would expect to observe on the production floor.


Baseline Operational Performance

The facility demonstrated strong operational performance entering the audit preparation phase.

Customer Quality Performance

    • 11 PPM customer defect rate across 15 million parts annually
    • 0.37 PPM warranty rate (4 returns in 10.6 million parts)

Supplier Management

    • 100% supplier audit completion for four consecutive years
    • Supplier audits conducted using VDA 6.3 certified auditors

Traceability Systems

    • Full SAP-based material traceability
    • Handling unit traceability including consumables

Process Controls

    • 100% automated end-of-line testing
    • Machine vision inspection at critical stations
    • Weld monitoring of current, voltage, displacement, and time

These metrics demonstrated a highly capable manufacturing operation prior to the Toyota audit preparation process.


Risks Identified During the Readiness Review

Despite strong operational performance,  TKD²  identified several areas that Toyota auditors commonly examine closely during supplier evaluations.

Documentation vs. Production Alignment

Certain PFMEA risk entries did not fully align with actual critical stations on the production line, creating potential audit concerns.

Visibility of Standardized Work

Work instructions were not consistently visible at all production cells, limiting clarity of standardized work at the gemba.

Scrap Containment Discipline

Some scrap containment areas lacked consistent locking or physical control measures.

Change Management Documentation

4M change tracking systems were not consistently implemented across production lines.

Consumable Lot Control

Certain production areas allowed potential mixing of consumable lots.

These issues did not indicate systemic quality problems, but they represented typical areas where Toyota auditors probe supplier discipline and system maturity.


Improvements Implemented

 TKD²  worked closely with plant leadership to implement targeted improvements prior to the audit.

Process Documentation Alignment

    • PFMEA and Control Plans updated to reflect actual production risk points

Standardized Work Visibility

    • Work instructions posted at all production cells
    • Operator training reinforced with visible standardized work

Quality Containment Improvements

    • Scrap handling procedures standardized
    • Physical containment controls implemented

Change Management Discipline

    • 4M change tracking logbooks implemented across production areas

Consumable Traceability

    • Improved lot traceability procedures
    • Smaller container sizes introduced to prevent lot mixing

These actions strengthened the plant’s ability to demonstrate Toyota Production System discipline directly on the production floor.


Special Process Audit Preparation

The Toyota audit also included detailed evaluation of welding operations classified as special processes.

The facility already demonstrated strong process controls, including:

    • RFID-based automatic welding parameter loading
    • Password-protected welding program management
    • Real-time weld monitoring
    • Automatic containment of non-conforming welds
    • Golden and Red Rabbit validation checks

 TKD²  supported additional preparation by:

    • Aligning PFMEA and Control Plans with welding process risks
    • Improving traceability of welding fixtures
    • Strengthening documentation of validation checks
    • Preparing operators to clearly explain process controls during the audit

Results

Following the readiness improvements and preparation efforts, the facility successfully completed the Toyota New Supplier Evaluation audit.

As a result, the supplier was approved as a qualified Toyota supplier and awarded new production business.

The preparation effort ensured the facility was able to clearly demonstrate:

    • Alignment with Toyota Production System expectations
    • Strong process discipline at the production floor
    • Robust traceability and containment systems
    • Controlled special processes with documented capability

The successful audit outcome validated both the plant’s operational capability and the effectiveness of the preparation process.


Value Delivered by TKD² 

 TKD²  provides independent readiness assessments for automotive suppliers preparing for major OEM supplier audits and new business opportunities.

By combining manufacturing expertise with an understanding of Japanese OEM audit expectations,  TKD²  helps suppliers identify and close risks before customer evaluations occur.

This approach enables suppliers to confidently demonstrate their operational systems and secure new business opportunities with global OEMs.

Have a similar challenge?  Want to chat with our team?  Reach out and talk to Tom or Dan

 

 

Factory-to-Forecourt-753x450px-1-1